A Rowan company - serving Dallas, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Full Bathroom Remodeling in Dallas, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Dallas
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Full Bathroom Remodeling in Dallas, TX

A full bathroom remodel in Dallas typically runs $18,000 to $48,000 for a standard hall or guest bath, and $35,000 to $85,000 for a primary suite with a large walk-in shower, freestanding tub, and double vanity. A full remodel means the room comes down to the studs: new rough-in plumbing and electrical, a replaced or reconfigured layout, and every surface, fixture, and finish replaced. We do this work on older Dallas housing stock where the problems are underneath – a 1955 ranch in Casa Linda with cast-iron drain lines near the end of their life, or a 1990s Lake Highlands two-story where the shower pan was set on a plywood deck that’s been quietly softening for years.

Under Clause 1 of the Haven Standard, you get a flat written price and a written scope before anyone picks up a tool. No “call for a quote.” Rowan Construction Group Dallas has delivered more than 4,000 projects since 2007 with that discipline, which is why jobs finish within a few percent of the number you agreed to. A full gut remodel is where change orders usually wreck a budget, and signed change orders are where we don’t. You can see the full range of scope we cover on our Bathroom Remodeling in Dallas page.

Call (833) 954-5327 to schedule your free estimate. A live person answers 24/7, and every estimate is backed by a written scope, a written warranty, and a documented photo record of what we found.

A tile setter installing wall tile in a shower

When You Need Full Bathroom Remodeling

  • The substrate is failing, not just the finish. In Dallas, we regularly see tile popping off shower walls in homes built between 1970 and 1995 because the original backer was moisture-resistant drywall rather than a proper cement board or a bonded waterproofing membrane. When the wall behind the tile crumbles to the touch, a cosmetic refresh won’t hold. That’s a full remodel.
  • You’re down to one working shower in a multi-bath house. A failed valve cartridge, a cracked pan, or a drain that won’t clear because the cast-iron line beneath it has scaled shut means the fixture is done. That’s the point where a full replacement usually costs less over ten years than three patch-and-pray repairs.
  • The layout fights you every morning. A 5×8 hall bath in a 1950s M Streets cottage with a swinging door that hits the toilet, or a primary suite in a Frisco build-out where the tub takes the only window wall. Full remodels are the moment to move a wall, swap a tub for a curbless shower, or steal 18 inches from a closet.
  • You’re renovating the whole house and the bath is next. If the kitchen is already open and the floors are up elsewhere, doing the bathroom at the same time keeps the rough-in work in one contract, one permit cycle, and one written price.
  • Water damage is hiding somewhere. A soft spot near the toilet flange, a stained ceiling in the room below, or a baseboard that’s swollen and pulling away. Dallas clay soils shift, and a slab or pier-and-beam floor that moved can crack a drain line or a shower pan. This needs to be opened up and inspected, not caulked over.
  • Aging in place is the goal. Curbless entry, a fold-down bench, blocking in the walls for future grab bars, and a comfort-height toilet. A full remodel is the time to put that blocking in correctly, because it’s nearly impossible to retrofit behind finished tile.

Our Full Bathroom Remodeling Process

  1. Walkthrough and photo record. We open what we can see – under the sink, behind the access panel, at the base of the shower – and photograph everything. You get the photo record as a standard deliverable, not an upsell. If we find a rusted-out cast-iron P-trap or a junction box buried behind drywall, it’s in the report before it’s in the price.
  2. Written scope and flat price. Every line is itemized: demolition and haul-off, rough plumbing, rough electrical, backer board or Schluter-type membrane, tile, fixtures, paint, trim, permit. Kohler and Toto fixtures, Cambria or Caesarstone countertops for the vanity top – named brands, real model numbers, honest numbers. You get this in writing before any work starts.
  3. Permits and inspection scheduling. A full remodel with moved plumbing or electrical requires a permit in Dallas, and the rough-in has to pass inspection before the walls close. We handle the paperwork and the inspection scheduling so the job doesn’t stall waiting on a callback.
  4. Demolition and framing, then rough-in. Down to studs, sister any rotted framing, replace subfloor where the pan failed, then set new supply and drain lines, add GFCI protection, and add exhaust vented to the exterior – not into the attic, which is a mold problem waiting to happen in Dallas humidity.
  5. Waterproofing, tile, and finish. Membrane, flood test where applicable, then tile, grout, and fixtures. Background-checked, uniformed technicians arrive on schedule, and you get a text confirmation of the day’s crew and window.
  6. Final walkthrough and warranty. We walk the room with you against the scope, hand you the written warranty, and cover all of it under the 365-Day Done Right Promise: if it isn’t done right, we make it right. Any change along the way requires a signed change order before work proceeds – no exceptions, no surprise invoices.
A newly finished roof with a ridge vent and step flashing

Full Bathroom Remodeling Pricing in Dallas

Here’s what full bathroom remodels actually cost in the Dallas market, broken out by line item. These are ranges, not a quote – the written price you get is flat and specific to your room.

Scope Typical Range What Drives the Number
Guest or hall bath, full gut, ~40-50 sq ft $18,000 – $32,000 Layout stays put; standard tile, mid-line fixtures
Primary bath, full gut, ~70-100 sq ft $32,000 – $60,000 Double vanity, walk-in shower, tub, larger tile field
Primary suite with layout change (wall move) $55,000 – $85,000+ Framing, moved plumbing, relocated drain, permit scope
Demolition and haul-off $1,800 – $4,000 Tile removal, tub and vanity disposal, dumpster
Rough plumbing (repipe or relocate) $2,500 – $9,000 Cast-iron replacement, moved drain, new valve
Rough electrical and exhaust $1,200 – $3,500 GFCI, dedicated circuits, exterior-vented fan
Waterproofing and tile $4,000 – $14,000 Membrane type, tile size, shower and floor area
Fixtures and vanity $3,000 – $12,000 Kohler vs. Toto, vanity brand, countertop material

What moves the range most: whether plumbing relocates, whether the drain line under the slab or subfloor is sound, tile size and material (large-format porcelain costs more to set than 12-inch ceramic), and whether you’re keeping the existing footprint. Dallas homes built before 1960 sometimes need the cast-iron drain stack replaced while the floor is open – it’s cheaper to do it now than to open the floor twice.

Bring us a competitor’s written estimate and we’ll review it line by line at no charge. That’s the Free Second Opinion, and it’s free because we’d rather you compare on the same scope than guess. Call (833) 954-5327 for a free estimate and a written price before any work begins.

FAQs – Full Bathroom Remodeling

How much does a full bathroom remodel cost in Dallas?

A full bathroom remodel in Dallas typically costs $18,000 to $48,000, with primary suites running $35,000 to $85,000 when the layout changes. The written price you get from us is flat and itemized, so the number on the page matches the number on the invoice. Call (833) 954-5327 for an exact quote – estimates are free.

How long does a full bathroom remodel take in Dallas?

A full bathroom remodel usually takes 4 to 8 weeks from demolition to final walkthrough, with layout changes and permit inspections pushing toward the longer end. Dallas permit and inspection schedules affect the timeline as much as the work itself. We confirm the schedule in writing before demolition and text you a crew confirmation each morning.

Is it cheaper to repair or fully remodel a bathroom?

It’s cheaper to repair a cosmetic issue, but full remodeling is cheaper than repeated repairs once the waterproofing or plumbing has failed. A shower pan that’s been leaking into the subfloor for years typically costs more in damage than a timely full remodel would have. We’ll tell you honestly which side of that line your room is on, backed by the photo record. Call (833) 954-5327 for a free estimate.

Can you remodel my bathroom and keep the same layout?

Yes. Keeping the existing layout is the single biggest cost saver in a full bathroom remodel, since plumbing and drain relocation drives much of the number. We can replace every surface, fixture, and finish without moving a drain, and still add curbless entry, blocking for grab bars, and a properly vented exhaust fan.

Do you handle permits for a full bathroom remodel in Dallas?

Yes. A full remodel that moves plumbing or electrical requires a permit in Dallas, and the rough-in must pass inspection before the walls close. We pull the permit, schedule the inspection, and keep the job moving so it doesn’t stall waiting on a callback. Rowan Construction Group Dallas has run this process across more than 4,000 projects since 2007.

Our technicians have up to 19 years of experience, and every crew member is background-checked before they arrive. If you’re weighing a full remodel against a smaller update, our home page shows the seven trades we cover and how the written-price discipline applies to each one.

Call (833) 954-5327 today for a free estimate. Let’s get a written price on your Dallas bathroom before anyone picks up a tool.

Written by the team at Rowan Construction Group Dallas, serving Dallas.

Getting started with Rowan in Dallas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Dallas team

A local vetted partner works across Dallas and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Dallas? Licensed & insured · free written estimates
Call (833) 954-5327
Local Service Coverage

Request a Free Estimate in Dallas

Tell us what you need - Rowan Construction Group Dallas responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch