







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Dallas, TX
A tub-to-shower conversion in Dallas typically runs $4,800 to $11,500 for a standard alcove swap, and most projects are done in five to eight working days once materials arrive. We remove the tub, rework the drain and valve rough-in, rebuild the waterproofing, and set a new shower base or a tiled pan in the same footprint. The work is quoted flat and in writing before anyone touches a tool, with a written scope and a written warranty attached.
If you’re comparing contractors, start with our Bathroom Remodeling in Dallas page for the full scope of what we do behind the tile. This page covers the tub-out, shower-in job specifically: what it costs here, what changes when you open a 1960s wall in a Lakewood ranch house, and how long you’ll be without a usable bathroom.
Our technicians have up to 19 years of experience, and we quote every project through Rowan Construction Group under The Haven Standard. Call (833) 954-5327 and we’ll take the details over the phone or text you a confirmation, whichever you prefer.

When You Need Tub-to-Shower Conversion
- Someone in the house can’t safely step over a tub wall. A curb height of 15 to 17 inches is a real fall risk for an older parent or anyone recovering from knee or hip surgery. A low-threshold or zero-threshold shower pan removes that step entirely.
- The tub is original to a 1950s to 1970s Dallas house and the surround is failing. In the M Streets and Lake Highlands, we routinely find cast-iron tubs set against drywall with no waterproofing behind the tile. Once the grout line opens, water has been getting into the wall for years.
- You shower, you never take baths. A standard tub wastes 8 to 12 square feet of floor space in a hall bath that already feels tight. Swapping to a shower usually buys back enough room for a bench or a proper linen niche.
- The tub is cracked, chipped, or flexing underfoot. A flexing fiberglass or acrylic tub stresses the drain connection and the surround seams below it. Resurfacing hides the problem; it doesn’t fix it.
- You’re reselling and the hall bath is dated. Dallas buyers in the $400K to $800K range look at the second bathroom closely. A clean tiled shower reads as newer than a beige tub with a shower curtain.
- You want a shower you can actually clean. Fewer seams, larger-format tile, and a properly sloped pan mean less scrubbing. That matters in a house with hard North Texas water that leaves mineral film on everything.
Our Tub-to-Shower Conversion Process
- Written price and scope first. Before any demolition, you get a flat price, a written scope naming the base type, tile, valve, and drain, and a written warranty. Under Clause 1 of the Haven Standard, the number is in writing before work starts. No exceptions.
- Photo record of what’s behind the wall. We open the surround and photograph the studs, the old drain, and the valve. If we find rot, a rusted galvanized drain, or missing subfloor, you see the photos and we price the change before proceeding. Nothing moves forward on a change until the change order is signed.
- Rough-in and waterproofing. We reset the drain to the new pan, adjust the valve height, and build the waterproofing layer – a bonded sheet membrane or a liquid-applied membrane over cement board, depending on the substrate. We photograph the membrane before tile goes on, because that’s the layer you’ll never see again.
- Pan, tile, and trim. A prefabricated acrylic or solid-surface pan goes in fast; a tiled pan with a linear drain takes longer and costs more but lets you match the floor to the walls. We set tile with a laser level on the walls and a proper slope to the drain, then grout and seal.
- Valve, head, glass, and finish. New pressure-balance or thermostatic valve, your choice of showerhead, and a framed or frameless glass panel. We hang the glass last so it doesn’t get chipped during the tile work.
- Walkthrough with the photo file. Every visit includes a documented photo record as a standard deliverable. You get the before, during, and after images, the signed change orders, and the warranty in one package.
If the surrounding bathroom needs more than the shower – a new vanity, floor tile, or lighting – that work rolls into a broader remodel. Start with the bathroom remodeling scope on our main page and we’ll price both together.

Tub-to-Shower Conversion Pricing in Dallas
Expect $4,800 to $11,500 for a tub-to-shower conversion in Dallas, depending on the base type, tile, and whether the drain or valve has to move. A straightforward acrylic pan and tub-surround replacement lands near the low end; a tiled pan with a linear drain, frameless glass, and a relocated drain lands near the top. These are the ranges we quote, not starting prices with add-ons to follow.
| Line item | Typical Dallas range |
|---|---|
| Demo and haul-away of old tub and surround | $350 – $650 |
| Drain relocation and rough-in | $600 – $1,400 |
| Waterproofing (membrane, cement board, pan) | $500 – $1,100 |
| Shower valve and trim (Kohler, Toto, or similar) | $450 – $1,200 |
| Acrylic or solid-surface pan | $400 – $900 |
| Tiled pan with linear drain | $1,800 – $3,200 |
| Wall tile and installation | $1,400 – $3,500 |
| Glass panel (framed to frameless) | $600 – $2,400 |
| Permit (where required by the City of Dallas) | $150 – $400 |
What moves the number. The drain location is the biggest variable. If the new shower drain lines up with the old tub drain, the rough-in is simple. If you want a linear drain at the far end of the pan, we’re cutting into the subfloor and re-plumbing, which adds $700 to $1,500. Tile choice is the second lever: a $4-per-square-foot porcelain and a $22-per-square-foot marble-look slab differ by four figures on the same walls. Moving the valve to the opposite wall is a third, and it’s worth doing if the current placement puts the showerhead in an awkward spot.
Dallas pulls permits for plumbing changes and for any alteration to a bathroom’s drain, waste, and vent lines. A licensed plumber has to sign off on the rough-in, and we build that into the written price rather than handing you a permit bill later. We name our fixture brands – Kohler, Toto, and other vetted lines – on the quote so you can compare line by line against a competitor’s.
Bring a competitor’s written estimate and we’ll review it line by line at no charge. That’s a standing offer, not a sales tactic. Call (833) 954-5327 for your free estimate, and it’s free whether or not you hire us.
FAQs – Tub-to-Shower Conversion
How long does a tub-to-shower conversion take in Dallas?
Most conversions take five to eight working days once materials are on site, with two to four of those days being the actual construction and the rest curing, waterproofing, and glass installation. A simple acrylic pan and surround can be done in three to four days; a tiled pan with a linear drain and custom glass runs closer to ten. Material lead times are the usual wild card – tile and glass can add one to three weeks from order to arrival. Call (833) 954-5327 and we’ll give you a firm timeline based on your selections.
Is a tub-to-shower conversion cheaper than a full bathroom remodel?
Yes, usually by a wide margin – a conversion runs $4,800 to $11,500 versus $18,000 to $45,000 or more for a full remodel. You’re keeping the toilet, vanity, and floor, so the cost stays concentrated in the shower zone. If the vanity and floor are also past their useful life, a full remodel spreads the labor more efficiently than three separate small jobs. Call (833) 954-5327 and we’ll tell you honestly which makes more sense for your bathroom.
Do I need a permit for a tub-to-shower conversion in Dallas?
Yes, whenever the drain, waste, vent, or water supply lines change, the City of Dallas requires a plumbing permit and inspection before the walls close. Cosmetic swaps that keep the existing drain location and valve in place sometimes don’t require one, but the distinction is worth confirming rather than assuming. We pull the permit as part of the written price and schedule the inspection so you’re not chasing paperwork. Call (833) 954-5327 to talk through what your specific job needs.
Can the shower go where the tub was, or do I need to reconfigure the bathroom?
In most Dallas bathrooms, the shower goes directly into the tub’s footprint with no reconfiguration, because both are built into the same alcove. A standard tub is 60 inches long and 30 to 32 inches wide, which matches a standard shower base, so the swap is geometrically straightforward. Problems show up when the alcove isn’t square, which is common in pre-1970 houses where the walls have settled. We check that during the estimate and photograph the reveal before quoting a fix. Call (833) 954-5327 for a free estimate on your specific bathroom.
Our technicians are background-checked and wear uniforms, calls are answered by a live person around the clock, and the photo record from every visit is included rather than sold as an upgrade. The 365-Day Done Right Promise means if something isn’t right, we make it right – the terms are written on every quote, not buried in an asterisk underneath it.
Ready to Talk Numbers?
Get a flat written price on your Dallas tub-to-shower conversion before anyone picks up a tool. Call (833) 954-5327 for a free estimate, or text us and we’ll confirm a visit window. Bring a competitor’s quote if you have one – we’ll review it line by line at no charge and show you where the prices differ. If you want the wider bathroom scope priced at the same time, read our Dallas Bathroom Remodeling page first and we’ll combine both into one written price.
Written by the team at Rowan Construction Group Dallas, serving Dallas.


